Construction of 20/150kV,40-50MVA Kithaironas Substation and 150kV Transmission Line

Engineering, Procurement & Construction (EPC) of 33/150kV 2200 MVA Kithaironas Substation and a 14 km 150kV overhead Transmission Line

Location
Mt. Kithaironas,
Viotia,Greece
Year
2011
Client
Gamesa S.A

Project Description

EPC of a 20/150kV 40-50 MVA Substation and a 150kV Transmission Line including:

  • Engineering ,Design of Civil & Electrical Systems of the substation
  • Permitting from IPTO
  • Supply of Power Transformer HV, MV and LV equipment and materials
  • Construction of concrete bases and steel structures for the equipment of the switchyard
  • Construction of the substation Control Building
  • Erection of the HV equipment / Power Transformer
  • Testing & Commissioning
  • Start Up
  • Engineering ,Design of Civil & Electrical Systems for the 150kV Transmission Line
  • Permitting from IPTO
  • Construction and improvement of access roads for the TL
  • Construction of platforms and foundations for steel towers
  • Supply and erection of steel towers (44 towers)
  • Stringing Works (use of helicopter)
  • Testing & Commissioning
  • Start Up