Projects

Construction of 39,6MW Wind Farm Vysima

Engineering, Procurement & Construction (EPC) of Balance of Plant (BoP) of a 39,6MW Wind Farm (8 Wind Turbine Generators, Siemens Gamesa SG 5.0-145), including a 12 km underground interconnection MV line and a 33/150kV 90/110MVA substation

Location
Melitis, Florina, Greece
Year
2021
Client
Visima Vendavel SA

Project Description

EPC of BoP of a 39,6MW Wind Farm and a 33/150kV 90/110MVA substation

  • Engineering ,Design of Civil & Electrical Systems of the Wind Farm
  • Construction of roads and platforms
  • Improvement of access roads
  • Construction of 8 WTG foundations
  • Supply of MV, FO cables and earthing conductor
  • Construction of internal network and of 12 km of underground interconnection MV line
  • Testing & commissioning
  • Start Up
  • Engineering ,Design of Civil & Electrical Systems of the substation
  • Permitting from IPTO
  • Supply of HV, MV and LV equipment and materials
  • Construction of concrete bases and steel structures for the equipment of the switchyard
  • Construction of the substation Control Building
  • Εrection of the HV equipment / Power Transformer
  • Supply and erection of HV towers for the interconnection of the Substation to the grid
  • Testing & commissioning
  • Start Up

Other Projects

  • Dervenochoria, Viotia, Greece
  • 2023
  • Iberdrola Group
  • Bekrevenikos, Kozani, Greece
  • 2022
  • Juwi Hellas S.A.
  • Petroussa, Drama, Greece
  • 2022
  • Wonderplant SA