Construction of HV substation 20/150kV Paiania, 2X50MVA, 2x12.5MVAR, GIS type, construction of HV 150kV double underground interconnection line, and 150kV Overhead Transmission Line for the capacity needs of the new 80MW Data Center
Engineering, Procurement & Construction (EPC) of HV substation 20/150kV Paiania, 2X50MVA, 2x12.5MVAR, GIS type, construction of HV 150kV double underground interconnection line, and 150kV Overhead Transmission Line for the capacity needs of the new 80MW Data Center
Location
Paiania, Attiki, Greece
Year
2026
Client
Cap Ingelec SAS Greece Branch
Project Description
EPC of HV substation 20/150kV Paiania, 2X50MVA, 2x12.5MVAR, GIS type, construction of HV 150kV double underground interconnection line, and 150kV Overhead Transmission Line for the capacity needs of the new 80MW Data Center
Engineering, Design of Civil & Electrical Systems of the substation
Permitting from IPTO
Supply of Power Transformers, HV, MV and LV equipment and materials
Construction of concrete bases and steel structures for the equipment of the switchyard
Design, procurement and construction of 150kV double circuit cable system
Construction of the substation Control Building
Erection of 150kV GIS, HV yard equipment / Power Transformers/ shunt reactors
Supply and erection of HV tower for the interconnection of the Substation to the grid