Projects

Construction of HV substation 20/150kV Paiania, 2X50MVA, 2x12.5MVAR, GIS type, construction of HV 150kV double underground interconnection line, and 150kV Overhead Transmission Line for the capacity needs of the new 80MW Data Center

Engineering, Procurement & Construction (EPC) of HV substation 20/150kV Paiania, 2X50MVA, 2x12.5MVAR, GIS type, construction of HV 150kV double underground interconnection line, and 150kV Overhead Transmission Line for the capacity needs of the new 80MW Data Center

Location
Paiania, Attiki, Greece
Year
2026
Client
Cap Ingelec SAS Greece Branch

Project Description

EPC of HV substation 20/150kV Paiania, 2X50MVA, 2x12.5MVAR, GIS type, construction of HV 150kV double underground interconnection line, and 150kV Overhead Transmission Line for the capacity needs of the new 80MW Data Center

  • Engineering, Design of Civil & Electrical Systems of the substation
  • Permitting from IPTO
  • Supply of Power Transformers, HV, MV and LV equipment and materials
  • Construction of concrete bases and steel structures for the equipment of the switchyard
  • Design, procurement and construction of 150kV double circuit cable system
  • Construction of the substation Control Building
  • Erection of 150kV GIS, HV yard equipment / Power Transformers/ shunt reactors
  • Supply and erection of HV tower for the interconnection of the Substation to the grid
  • Testing & commissioning
  • Start Up

Other Projects

  • Dervenochoria, Viotia, Greece
  • 2023
  • Iberdrola Group
  • Fyteies, Aetolia-Acarnania, West Greece
  • 2023
  • Energeiaki Koinotita Yperion Syn.P.E.
  • Bekrevenikos, Kozani, Greece
  • 2022
  • Juwi Hellas S.A.